Skip to the content

Hampshire Local Jobs

VN6090 Project Scheduler (P6) Jobs in Southampton on your local Southampton jobs site. Careers in Southampton, local employment and work in Southampton.

Recruiting? Call now on 0845 017 6777.

Search Jobs

Postcode Search

VN6090 Project Scheduler (P6)

Sorry, this job has expired and cannot be applied for. We still have a large selection of jobs on the site. Why not try an alternative search?

  • SouthamptonPO3 5PU
  • Posted 11th Mar 2010
  • Posted by: s·com Managed Services
  • Salary: 27 GBP per hour + contract
  • Job Type: Contract
  • Reference: 2244526
  • This job has been viewed 175 times since it was posted.

Job Description

Our client is a world leader in the design and manufacture of satellite systems. Their activities cover complete civil and military telecommunications and Earth observation systems, science and navigation programmes, together with avionics and a wide range of space equipment and associated ground infrastructure. They have a new and exciting opportunity for a Project Scheduler. Job Profile Build a schedule for telecommunications payloads, consolidating plans and inputs, maintain and update. Have the ability to communicate with other schedulers to gather timely updates. Present critical path, schedule variances and recovery actions to the Project Manager. Qualifications/Skills/Experience Essential: Primavera Project Management PM Version 6.1 user (must have P6 not acceptable to only have P3). Desirable: Engineering qualification Previous Experience Essential: Must have suitable experience in scheduling projects. This vacancy is being advertised by s.com Group Ltd. The services advertised by s.com Group Ltd are those of an Employment Agency and an Employment Business. s com® is the registered trademark of S.Com Group Ltd.

Bookmark with: